03.3 / Geotechnical

Soil study and geotechnical holes must stay short, logged and repeatable.

Observation and survey holes are not production wells. The job is sample, log and safe close-out.

⚡ 300–500 m truck and 400–600 m trailer classes sit in the catalogue for mid-depth survey work.

Request a quote

Mustafa Kemal Mh. 2125 Sk. No: 9/10, Çankaya / Ankara