Petroleum drilling
Energy wells put mast load, mud and site safety first.
Read more →One mast does not finish every job. Water, geothermal, geotechnical and mineral programmes need different plans and tools.
Energy wells put mast load, mud and site safety first.
Read more →Drinking and irrigation wells; municipal scopes of 500–1600 m are published.
Read more →Pre-construction ground holes, read with the geotechnical line.
Read more →Monitoring holes. The product is data, not water yield.
Read more →A core programme and a separate site plan for sample integrity.
Read more →Log, sample and close-out discipline. Mid-depth masts.
Read more →High depth, with a published 1200–2600 m geothermal scope.
Read more →Locating water and drilling the well are separate jobs that can share a project.
Read more →Mustafa Kemal Mh. 2125 Sk. No: 9/10, Çankaya / Ankara